High-Density Pallet Shuttle System Improves Storage Capacity & Stock Flow for Wheel Assemblers
Engineering High-Density Storage for a Fast-Moving Tyre Distribution Operation
When Wheel Assemblers, a leading tyre assembly and distribution company based in Rosslyn, Pretoria, required a more efficient way to increase storage capacity and improve warehouse stock flow, the company partnered with Logistics Systems Engineering (LSE) to design and install a High-Density Pallet Shuttle Racking System.
The solution incorporated Radio Frequency (RF)-controlled Pallet Shuttle technology, allowing Wheel Assemblers to maximise storage density while improving pallet handling efficiency and reducing unnecessary forklift travel within the warehouse.
Completed in just nine days, the project delivered a modern high-density storage solution capable of supporting the company’s growing inventory requirements while improving overall warehouse productivity.
About Wheel Assemblers
Wheel Assemblers specialises in the storage, assembly and distribution of tyres, supplying customers across South Africa through a fast-moving warehouse operation.
Handling large quantities of tyres requires warehouse systems capable of storing high pallet volumes while maintaining efficient stock movement, quick product accessibility and reliable inventory management.
To support these operational requirements, Wheel Assemblers required a High-Density Pallet Shuttle System that would increase storage capacity while improving warehouse efficiency without expanding the existing facility
The Challenge: Increasing Storage Capacity While Improving Stock Flow
As warehouse demand increased, Wheel Assemblers required a storage solution capable of supporting continued operational growth while making better use of the available warehouse space.
The project objectives included:
- Increasing storage capacity within the existing warehouse footprint.
- Improving stock flow and pallet movement.
- Reducing forklift travel inside storage lanes.
- Supporting high-density storage for large quantities of similar products.
- Improving warehouse productivity and operational efficiency.
- Providing flexible inventory management using both FIFO and LIFO principles.
- Delivering a reliable system suitable for daily high-volume operations.
The customer required a solution that would improve both storage density and warehouse performance without disrupting ongoing operations.
The Solution: High-Density RF Pallet Shuttle System Engineered by LSE
LSE designed and installed a High-Density Pallet Shuttle Racking System specifically configured to maximise storage density while improving stock flow throughout the warehouse.
The installation incorporated two RF-controlled Pallet Shuttle units operating within 16 storage channels, allowing pallets to be transported automatically through deep storage lanes while forklifts remained at the channel entrance.
This configuration significantly reduced forklift travel, improved pallet handling efficiency and increased overall warehouse throughput.
The system was configured to support both FIFO and LIFO inventory management strategies, providing Wheel Assemblers with the flexibility to optimise stock movement according to operational requirements.
Technical Data: Wheel Assemblers Pallet Shuttle System
Pallet Shuttle Racking System
| Technical Specification | Project Detail |
|---|---|
| Client | Wheel Assemblers |
| Industry | Tyre Assembly & Distribution |
| Storage System | High-Density Storage Racking with Integrated RF Pallet Shuttle |
| Shuttle Type | RF Pallet Shuttle |
| Number of Shuttles | 2 Shuttles |
| Total Pallet Positions | 464 Pallet Positions |
| Number of Storage Channels | 16 Storage Channels |
| Maximum Channel Depth | 36 150mm |
| Racking Height | 4 000mm |
| Pallet Dimensions | 1 200 (W) x 1 200 (D) and 1 400 (H) mm |
| Maximum Pallet Weight | 400kg |
| Operating Temperature | Ambient |
| Inventory Management | FIFO & LIFO |
| Control System | Remote Control |
| Application | Ambient Tyre Storage |
| Project Duration | 9 Days |
Technical Data: Wheel Assemblers Pallet Shuttle System
Pallet Shuttle Racking System
| Technical Specification | Project Detail |
|---|---|
| Client | Wheel Assemblers |
| Industry | Tyre Assembly & Distribution |
| Storage System | High-Density Storage Racking with Integrated RF Pallet Shuttle |
| Shuttle Type | RF Pallet Shuttle |
| Number of Shuttles | 2 Shuttles |
| Total Pallet Positions | 464 Pallet Positions |
| Number of Storage Channels | 16 Storage Channels |
| Maximum Channel Depth | 36 150mm |
| Racking Height | 4 000mm |
| Pallet Dimensions | 1 200 (W) x 1 200 (D) and 1 400 (H) mm |
| Maximum Pallet Weight | 400kg |
| Operating Temperature | Ambient |
| Inventory Management | FIFO & LIFO |
| Control System | Remote Control |
| Application | Ambient Tyre Storage |
| Project Duration | 9 Days |
Engineering a Warehouse for Greater Efficiency
The Pallet Shuttle System was selected because it provided the ideal balance between storage density, operational flexibility and throughput.
Unlike conventional storage systems that require forklifts to travel deep into storage lanes, the Pallet Shuttle automatically transports pallets to the required storage location, allowing forklift operators to remain at the entrance of each storage channel.
This significantly improves warehouse productivity while reducing equipment wear, forklift congestion and the risk of accidental racking damage.
The deep-lane configuration also enabled Wheel Assemblers to maximise every square metre of available warehouse space without requiring additional building expansion.
Rapid Project Delivery
LSE successfully completed the installation within just nine days, ensuring minimal disruption to daily warehouse operations.
The project included:
Phase 1 – Site Preparation
Engineering verification, layout confirmation and preparation of the installation area.
Phase 2 – Racking Installation
Installation of the high-density pallet shuttle racking structure, storage channels and guide rails.
Phase 3 – Shuttle Integration
Commissioning of the RF Pallet Shuttle units together with the remote-control system.
Phase 4 – Testing & Handover
System testing, operational verification, commissioning and operator training to ensure safe and efficient daily operation.
Results: A High-Performance Pallet Shuttle Storage Solution
The completed installation delivered several important operational improvements:
- Increased storage capacity within the existing warehouse footprint.
- Improved warehouse stock flow and pallet movement.
- Reduced forklift travel inside storage lanes.
- Faster pallet storage and retrieval.
- High-density storage across 16 deep storage channels.
- Flexible FIFO and LIFO inventory management.
- Improved warehouse productivity.
- Complete project delivered in only 9 days.
Customer Handover
Following commissioning, LSE completed operator training and system handover, ensuring the Wheel Assemblers team could confidently operate the RF Pallet Shuttle System safely and efficiently.
The project demonstrates LSE’s ability to design, engineer, install and commission high-density pallet shuttle systems tailored to demanding industrial warehouse environments.
Engineering Warehouse Throughput
The Wheel Assemblers project demonstrates how intelligent warehouse design can increase storage capacity while improving operational efficiency.
By combining high-density pallet storage with semi-automated RF Pallet Shuttle technology, LSE delivered a solution that enhances stock flow, reduces unnecessary forklift movement and maximises warehouse performance.
Whether operating in tyre distribution, manufacturing, logistics, food & beverage or general warehousing, LSE’s Pallet Shuttle Systems are engineered to increase storage density, improve throughput and support long-term operational growth.
Project Images & Illustrations
Ask an Expert
I would like a Quote for LSE’s Pallet Shuttle Racking System
Please Fill in the Form Below. Specify the Product Information you Require or How LSE can Help you.